Foundation (Reinforced Concrete), Wall (Light Brick + Plaster, Finishing and Paint), Bathroom Wall (Roman or Equivalent), Floor (Homogeneous Tile 60x60), Door (Engineering Door), Door and Window Accesores (Fino or Equivalent), Windo and Door Frames (Aluminium Frame Ciating Powder Finish + Glass, Roof (Spandex Toll), Ceiling (Galvanized Metal Hollow & Gypsum Board, Paint Finishing), Sanitair (Toto or Equivalent), Water Installation (PVP Piping c/w Jet Pump), Electricity (Standard PLN 3500 VA), Septic Tanc (Bio-sEPTIC Tank), AC Installation (Socket, Water Drain Pipe, and Refrigerant Piping (non AC unit), Roof Tank (Fiber Glass Cap 1000 Liter